Where has March gone, this glorious month of perfect outdoor weather? Kathy and I took on a couple of epic projects and brought our favorite contractor back to help with two jobs we knew we couldn't do well on our own.
One rainy day last week I bought a walk-behind lawn mower with powered wheels, a 21" Honda, so that I could do the tender areas where I don't want heavy lawn machinery chewing up the sod. The early spring put the grass into a burst of growth, so I mowed most of the property in two big sessions on Sunday and Monday. Today I feel like well-rusted machinery in a junk yard. I'm used to 30 minutes on a treadmill at the gym. Two hours behind a lawn mower put my legs into a state of emergency, and I had to do another hour or so yesterday to do the back yard.
This is not whining. I am delighted to have the exercise outside rather than on a treadmill in a gym.
Steve Brandt and Tim Yanko have been correcting the French drain that probably never drained anything in its life.
This wall is on the right as you walk out of the garage. On the other side is a steep grassy hill that was showing signs of steady erosion last spring, owing to the failure of the drain to catch any of the storm water that flows down the driveway and through the wall on the way to the lake below. The French drain connects to a buried drainage pipe that Steve installed on the other side last April. It empties into the storm drainage swale in the distance beyond the wall. We'll get to that part of the story in a minute.
Opposite this wall is a companion wall on the left as you walk out of the garage. They are moving the wall so that we can plant on either side of it.
They finished laying a new base yesterday afternoon. The original wall was laid up without a base. Since the soil can become waterlogged after a long rain, we wanted to protect against settling and tilting, so the base includes at least six inches of crushed rock.
Kathy has been at work since Sunday planting one of the two corner berms we built last May.
She planted creeping phlox in two colors all along the outer edge. The wispy shrubs on the crest of the berm are Russian Sage plants just coming back to life. The three trees are Kousa dogwoods. They flower after leafing out in the spring and are suited to a full-sun location. Our "line-out" beds for daylilies are laid out in S-curves inside the berm.
Looking at it from the other end, you can make out the pretty blue perennials (Lithodora) she alternated with a small variety of creeping Thyme. The Lithodora is a creeping plant that she hopes will join with the Thyme in covering the surface.
The collapsed drainage swale I've been writing about is within two more work sessions of being emptied of rubble and paving brick. I spent two hours yesterday lobbing bricks onto the grass.
I finally exposed the ugly break that had been obscured by layers of paving bricks. Not that this is any better, but "inquiring minds want to know." I imagine the developer built this swale in the same fly-by-night manner he built the house we live in. Over the years it cracked, and water got under it, and a trickle became a rivulet, and so on, until a big section collapsed into the undermined area and broke apart.
The problem I saw when we first inspected the property is that the mass of fill material was mounded up down the center of the channel, forcing storm water out to the sides and sometimes over the bank. The sides in this area have been considerably widened by water flows, and the slope of the broken concrete exacerbates the problem. A great deal of the rock I've tossed out has to go back in on the sides to protect the banks and force the water toward the middle, which has to be lowered.
"Sometimes in this life, Baby, ya see things ya don't wanna see." There's one more pile of paving bricks in the way of seeing what I have to deal with, and one more small zone of rocks beyond the bricks. I might have to invite Steve and Tim back with their jackhammer to break up that big sloping section, but there's another big section under the last brick pile.
By the end of this week, I want to know what this looks like without rubble.
Showing posts with label yard drainage. Show all posts
Showing posts with label yard drainage. Show all posts
Tuesday, March 27, 2012
Thursday, April 21, 2011
Closing Time at the Duckworthy Estate Rubble Museum
It's all about beginning the ending of bad things. Someone who will not be named had a really, really bad idea one day on the side of the Duckworthy property he couldn't see unless he stepped out on his deck. "Someone" is not me, by the way.
On that side of the property, a neighborhood storm drainage system empties into Hidden Lake by means of, first, a concrete swale, and second, a ditch of some kind that may once have been lined with concrete. The concrete part at the top of the hill cracked over the years, allowing water to gradually undermine it, causing further cracking and further undermining and erosion.
The former owner addressed the problem, if addressed is an apt word, by tossing patio bricks into the holes and gaps. It looks like an extensive patio was sacrificed to provide those bricks. Other pavers, concrete blocks, and hard things were tossed in over time.
This was the beginning of the Rubble Museum. At some later time, the owner had his concrete driveway broken up into convenient twenty- or thirty-pound pieces and replaced. Rather than have the broken driveway hauled away, he thought the pieces would make good rip-rap material for the eroding gully. However, instead of keeping the shape of the gully concave, so that water could course through it, he mounded up the concrete rubble with a bad consequence. Water began to run around it.
Also, the continual undermining of the upper part carried dirt down the line to the pile of rubble, where it dropped between the stones, bricks, and concrete pieces, gradually raising the bed of the gully.
A few days ago we had the heaviest rain in the past seven months, though nothing for the record books, and I woke to see most of the back yard covered in the runoff that should have gone down the gully to the lake. That's when I decided we'd have to close the Duckworthy Estate Rubble Museum and return it to its former glory as a gully.
Yesterday Kathy and I spent an hour and a half or two pulling rubble away from the left side. We got a lot more done than we thought possible in that time. I think we can clear the watercourse in the next couple of weeks and then try to remake it, perhaps with some help. Here's what it looked like at the end of our first work session.
The orange cord in the foreground is not an electrical cord, but seems to be some sort of cable system no longer in use at our house. The company that installed it (Charter?) only put it a couple of inches into the ground.
On that side of the property, a neighborhood storm drainage system empties into Hidden Lake by means of, first, a concrete swale, and second, a ditch of some kind that may once have been lined with concrete. The concrete part at the top of the hill cracked over the years, allowing water to gradually undermine it, causing further cracking and further undermining and erosion.
The former owner addressed the problem, if addressed is an apt word, by tossing patio bricks into the holes and gaps. It looks like an extensive patio was sacrificed to provide those bricks. Other pavers, concrete blocks, and hard things were tossed in over time.
This was the beginning of the Rubble Museum. At some later time, the owner had his concrete driveway broken up into convenient twenty- or thirty-pound pieces and replaced. Rather than have the broken driveway hauled away, he thought the pieces would make good rip-rap material for the eroding gully. However, instead of keeping the shape of the gully concave, so that water could course through it, he mounded up the concrete rubble with a bad consequence. Water began to run around it.
Also, the continual undermining of the upper part carried dirt down the line to the pile of rubble, where it dropped between the stones, bricks, and concrete pieces, gradually raising the bed of the gully.
A few days ago we had the heaviest rain in the past seven months, though nothing for the record books, and I woke to see most of the back yard covered in the runoff that should have gone down the gully to the lake. That's when I decided we'd have to close the Duckworthy Estate Rubble Museum and return it to its former glory as a gully.
Yesterday Kathy and I spent an hour and a half or two pulling rubble away from the left side. We got a lot more done than we thought possible in that time. I think we can clear the watercourse in the next couple of weeks and then try to remake it, perhaps with some help. Here's what it looked like at the end of our first work session.
The orange cord in the foreground is not an electrical cord, but seems to be some sort of cable system no longer in use at our house. The company that installed it (Charter?) only put it a couple of inches into the ground.
Labels:
swale,
yard drainage